Gold Member Since 2016
ZHEJIANG MJT MACHINERY&ELECTRIC CO., LTD.

Cut-off Machine, Cut off Saw, Cutting Machine manufacturer / supplier in China, offering New Designed 2400W Cut off Machine Gby355A, 1050W Demolition Hammer/Breaker Hammer 0855, Professional Aluminum Power Tool Metal Cut off Machine (HL355-6) and so on.

(/ )

Supplier Homepage Product Cut off Machine New Designed 2400W Cut off Machine Gby355A

New Designed 2400W Cut off Machine Gby355A

Purchase Qty.:
(Pieces)
500-1,999 2,000+
FOB Unit Price: US $37.5 US $36.8
Purchase Qty. (Pieces) FOB Unit Price
500-1,999 US $37.5
2,000+ US $36.8
Get Latest Price
Port: Ningbo, China
Production Capacity: 1, 000, 000
Payment Terms: L/C, T/T, D/P, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: GBY355A
  • Application: Metal Saw, Stone Saw
  • Type: Fixed
  • Customized: Customized
  • Trademark: HOLE
  • Specification: 540x330x425mm
  • HS Code: 8461500090
  • Saw Type: Circular Saw
  • Brand: Hole
  • Power Source: Electricity
  • Condition: New
  • Transport Package: Color Box in Caton Box
  • Origin: Jinhua, China
Product Description

14 Inches Metal Cutting Machine/Cut off Machine/Cutting Machine(HL355-2)
Disc Diameter:355mm
No Load Speed:3900r/min
Rated Input Power:2400w
New Designed 2400W Cut off Machine Gby355A


New Designed 2400W Cut off Machine Gby355ANew Designed 2400W Cut off Machine Gby355ANew Designed 2400W Cut off Machine Gby355ANew Designed 2400W Cut off Machine Gby355ANew Designed 2400W Cut off Machine Gby355A

Quality control: 
All MJT-Baoyuan product pass 100% full inspection.
And all spare parts passed separate inspection.
90% of Spare parts are made by ourselves. Including , gear, rotor , stator, shaft ,plastic shell, gear box, shaft driver ... 

FAQ:
Q: What's your MOQ? 
A: Our MOQ is 1 carton(5-10 units) per model for factory brand and package.  
  For OEM order is 500pcs per model.
 
Q: What's your payment terms? 
A: L/C, T/T, DP , OA, Wester union is acceptable;  
 
Q: What's the delivery time? 
A: Factory brand and package order can be dispatch the same day when we received the order and payment.
OEM order can deliver the goods within 20-40 days after confirmed order.

 
Send your message to this supplier
Avatar
Ms. wendy
manager
*From:
To: Ms. wendy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now