Zhejiang, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration, Tools & Hardware
Plant Area:
>2000 square meters
Main Markets:
North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service
Sample Available

Cut-off Machine, Cut off Saw, Cutting Machine manufacturer / supplier in China, offering Cut-off Machine Power Tool (355-6), 110mm Stone Processing Machinery Cut off Machine (GBY110A), 55j 1800W Model Demolition Hammer (GHX65A) and so on.

Gold Member Since 2016

Cut-off Machine Power Tool (355-6)

Get Latest Price
Purchase Qty. / Reference FOB Price
500-1,999 Pieces US $42.6
2,000+ Pieces US $40.5
Port: Ningbo, China
Production Capacity: 1, 000, 000
Payment Terms: L/C, T/T, D/P, Western Union
Application: Metal Saw, Stone Saw
Brand: Heli
Type: Fixed
Power Source: Electricity
Customized: Customized
Condition: New

You Might Also Like

Loading...

Basic Info

Model NO.: 355-6
Trademark: HOLE
Transport Package: Color Box in Caton Box
Specification: 540x330x425mm
Origin: Jinhua, China
HS Code: 8461500090

Product Description



Cut-off Machine Power Tool (355-6)
Disc Diameter:355mm
No Load Speed:3900r/min
Rated Input Power:2200w

Cut-off Machine Power Tool (355-6)

Cut-off Machine Power Tool (355-6)Cut-off Machine Power Tool (355-6)Cut-off Machine Power Tool (355-6)Cut-off Machine Power Tool (355-6)Cut-off Machine Power Tool (355-6)

Quality control: 
All MJT-Baoyuan product pass 100% full inspection.
And all spare parts passed separate inspection.
90% of Spare parts are made by ourselves. Including , gear, rotor , stator, shaft ,plastic shell, gear box, shaft driver ... 

FAQ:
Q: What's your MOQ? 
A: Our MOQ is 1 carton(5-10 units) per model for factory brand and package.  
  For OEM order is 500pcs per model.
 
Q: What's your payment terms? 
A: L/C, T/T, DP , OA, Wester union is acceptable;  
 
Q: What's the delivery time? 
A: Factory brand and package order can be dispatch the same day when we received the order and payment.
OEM order can deliver the goods within 20-40 days after confirmed order.

 

Send your message to this supplier

*From:
*To:
avatar Ms. Wendy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now